02 · Kitchen & bath design

Design for the rooms you only get to build once.

Cabinetry, stone, tile, fixtures and lighting decided as one set — before demolition, and before anything goes on order.

A white kitchen with open shelves and a marble backsplash, seen across a pale sectional from the living room

What it includes

Kitchen and bath design covers the fixed parts of the room: where the cabinets go, what the counters and tile are, which fixtures and appliances the plumbing and electrical get built around, and how the lighting is laid out and switched. I make those decisions with you before anything is ordered, then hand your contractor and cabinet shop a set of drawings and specifications precise enough to build from.

The failure this removes is a room decided in the order the suppliers ask for it. The cabinet shop needs a plan, so the layout gets settled in a hurry; the counter is chosen against a cabinet sample; the tile is chosen against the counter; the lighting is whatever the electrician asks about on the day he is standing there. Every choice is defensible on its own, and the finished room still does not agree with itself — the metals fight, the tile reads pink beside the stone, the pendants land off center over the island.

Layout mistakes are the expensive ones, and they surface late. A dishwasher door that blocks the only silverware drawer, a range with no landing space beside it, a vanity door that swings into the towel bar — all of those are free to fix on paper and cost a rebuild once cabinetry is on order. Catching them early is most of what you are paying a designer for in these two rooms.

  • Layout and cabinetry plan drawn to your appliance dimensions
  • Counter, backsplash and tile selections, with slab guidance
  • Plumbing fixtures, sinks and appliance specifications
  • Lighting layout, including switching and outlet placement
  • Cabinet interior and storage plan
  • Hardware, metals and finish coordination
  • Cabinet, trim and wall color for the room and what it opens onto
  • Contractor-ready drawings and a full specification schedule

Who it suits

This is the right service if…

Most kitchen and bath projects run alongside a paint consultation, so the cabinet color agrees with the rooms it opens onto, and furniture sourcing, which takes over the ordering of stools, vanity pieces and light fixtures once the specifications are set.

How it runs

What happens, step by step.

  1. 01

    Measure and walk the room

    In the Charlotte area I come to the house; elsewhere you send measurements, photographs and a video walkthrough. I want the existing plumbing and window positions, the appliances you intend to keep, and a plain account of what does not work now — how you actually cook, where things pile up, who is in the room at once.

  2. 02

    Settle the layout first

    Before a single finish is chosen, we agree on the plan: where the sink, range, refrigerator and seating sit, what each cabinet run holds, and how the room is lit and switched. Appliance models are locked at this stage, because cabinet openings are built to their exact dimensions and a substitution later is not a small change.

  3. 03

    Choose the finishes as one set

    Cabinetry, counters, backsplash, plumbing, hardware, lighting and paint come to you together, with real samples for the things that shift under your own light. You see the whole material palette side by side and approve it as a group, not one order form at a time.

  4. 04

    Hand it to your builder

    You receive drawings and a specification schedule your contractor and cabinet shop can order from — model numbers, finishes, dimensions and placement. I stay reachable through the build for the questions that come up on site, which is when most of the improvising otherwise happens.

What clients say

Kind words,
beautiful outcomes.

Rated 5.0 from 26 Google reviews.

Read all 26 on Google

Before you book

Questions worth asking.

When in a renovation should I bring you in?

As early as you can, and certainly before the cabinet order. The most useful moment is when contractor conversations are starting and nothing has been quoted yet, because that is while the layout is still free to change. If cabinetry is already ordered the work is still worth doing, it just narrows to the finishes, lighting and color that remain open. Tell me where you actually are and I will say honestly what is still on the table.

Do you work with my contractor, or do I need to find one?

I’m happy to work with a contractor you already trust, or I can recommend a trusted professional who may be a good fit for your project. You’ll contract with them directly, while I provide the design plans, specifications, and ongoing design guidance needed to bring the vision to life.

What does a kitchen or bath design cost?

It depends, and here is what it depends on: whether it is one bathroom or a kitchen plus the rooms it opens onto, whether the layout stays put or walls, plumbing and windows move, how many selections there are to make, and whether you want me to handle ordering as well as specifying. A powder room refresh and a kitchen with a relocated range wall are not the same job and should not carry the same fee. I quote after we have talked about the actual room.

Can you do this if I’m not in Charlotte?

Yes. The design and specification work runs the same virtually, and I take those projects nationwide. What changes is the physical checking: I cannot stand in the room, so you send careful measurements, photographs and video, order samples to see them in your own light, and view stone slabs yourself with a list of what to look for. If your project turns on the exact character of a slab or on an unusual existing condition, say so early and we will decide together whether virtual is the right fit.

Do you produce drawings my cabinet shop can work from?

Yes. The handoff is contractor-ready drawings and a full specification schedule, which is what a cabinet shop, a tile setter and a plumber each need in order to price and build the same room.

Can you work with the layout I have, if moving plumbing is out of the question?

Yes, and it is a common constraint. Where the drains and vents are is often the real limit rather than the walls, so the plan is drawn against what can actually move on your budget.

I have already ordered some of it. Is it too late?

No, but tell me early exactly what is ordered and what is only quoted. Everything still open gets chosen to agree with what is already committed, which is a narrower job than starting fresh and worth doing properly.

How do you choose between quartz, granite and marble?

By how the room gets used, not by what is fashionable. Each behaves differently around heat, acid and daily wear, and the honest answer for a kitchen that cooks every night is different from the one for a guest bath.

Do you help choose appliances?

Yes, and the sequence matters: cabinetry is drawn to appliance dimensions, so those get settled before the cabinet order rather than after. Panel-ready and standard-depth decisions change the drawing, not just the invoice.

Is lighting part of a kitchen or bath design?

Yes — layout, fixture selection, switching and outlet placement. Those are decided while the walls are open, because that is the only cheap moment to decide them.

We are renovating in stages. Can you still plan the whole thing?

That is one of the better reasons to plan it all now. Settling the whole scheme means the counters you buy in two years still fit the cabinets you order this month, instead of a second design that has to apologise for the first.

What do you need before the first meeting?

Don’t worry about having everything figured out before we meet. Bring any inspiration, photos, existing plans, or selections you already have, and we’ll work through the rest together.

Other ways to work together

Not quite the right fit?

Home office with a pale wood desk, drum pendant and linen drapery to the floor01

Full-Service Interior Design

From the first idea to the final detail, I manage the design process so you can enjoy a home that feels cohesive, finished, and completely yours.

Available exclusively in the Charlotte area.

Explore Full-Service Design
Tatyana holding a fan of paint decks in a doorway02

Paint Color Consultations

I’ll help you choose colors that complement your lighting, finishes, and surroundings—so your home finally feels cohesive from one space to the next.

Available in person in the Charlotte area or virtually nationwide.

Explore Paint Consultations
Living room with a curved bouclé sofa, fluted side table and an arched mirror over the mantel03

Furniture & Room Design

Turn an unfinished room into a space that feels complete.

I help you select the right furniture, lighting, and finishing details to bring everything together.

Explore Furniture & Room Design
Living room with a cream sofa, tan swivel chairs and tall windows onto the deck04

Virtual Design Consultation

During a focused consultation, we’ll work through the decisions keeping you stuck and create a clear direction you can confidently follow.

Available in person in the Charlotte area or virtually nationwide.

Explore Design Consultations
Brick colonial porch dressed with garland and candles down the front steps05

Seasonal Styling

Four ways to have Christmas done for you, from the tree alone to the whole house and the porch.

Everyone is quoted after I’ve seen the rooms.

Explore Seasonal Styling

Let’s make your next decision the easy one

Ready to start?

Tell me what you’re working on, and let’s choose the right next step together.

Let’s talk about your home

Start in the way that feels easiest.

Ready to share the details? Complete the project inquiry form, and I’ll recommend the best next step.

Prefer to talk first? Book a free 15-minute call to ask about my services and see which option fits your project.

Tatyana, Charlotte interior designer
TatyanaInterior designer
& your designer BFF
“Every good room starts with one honest conversation about how you actually live.”

Not sure which service you need?

Let’s find the right next step for your home.

Book a complimentary 15-minute Project Fit Call to briefly share what you’re working on, ask questions about my services, and determine which option best fits your project.

Book a Free 15-Minute Call

You only need to choose one—submit the form or book a call.

  • Replies within one business day
  • Charlotte in person, nationwide virtuallySame attention either way.
253-250-6658

0/1000

By sending this you agree to be contacted about your enquiry. Nothing else, ever.

Before demolition

Everything a kitchen has to settle first.

A kitchen is the only room in a house where a decision made on a Tuesday in February can still be annoying you in eleven years. Everything in it is fixed, expensive and connected to everything else: the cabinet run has to know the appliance depth, the appliance has to know the counter overhang, the counter has to know the backsplash, and all of them have to know where the plumbing is. Change one late and the others move with it, usually at a cost.

That is the entire argument for designing the room completely before demolition rather than deciding as you go. Not because it's tidier, but because the expensive mistakes in a kitchen or a bathroom are almost never taste mistakes — they're sequence mistakes. Below is what actually gets settled, in what order, and which of the constraints people worry about are real.

What has to be decided before anyone swings a hammer

The full set:

  • The layout.
  • The cabinetry plan drawn to your specific appliances.
  • Counters and their edge profiles.
  • Backsplash and floor tile.
  • Every plumbing fixture.
  • The lighting layout with switching and outlet placement.
  • The cabinet interiors, hardware and metal finishes.
  • The paint for the room and whatever it opens onto.

That's what a contractor-ready drawing set and specification schedule contains.

The reason it's all up front is that a cabinet shop needs a final drawing to cut from, and a tile setter needs the layout before the first sheet of backer board. Deciding the backsplash after the cabinets are hung is how you end up with a three-inch sliver of tile at the end of a run, or an outlet in the middle of the one place you wanted uninterrupted.

Which layout constraints are real

What moves cheaply

Electrical moves cheaply while the walls are open — outlets, switches, new circuits, under-cabinet wiring. Non-load-bearing partition walls are usually straightforward. Supply lines for water have more freedom than most people assume.

What doesn't

Drains and vents are the real limit. Waste lines need fall, and vents need a path up through the structure. Moving a toilet three feet on a slab is a very different job from moving it three feet over a crawl space, and on a second floor it may mean opening the ceiling below. Gas lines, the panel's capacity and any structural wall are the other three.

So the plan is drawn against what can actually move on your budget, and I'd rather know the answer in week one than design around a wish. If the drains stay, we design a genuinely good room around them — that is a normal constraint, not a compromised project.

Cabinetry, in the order it gets decided

Construction

Framed cabinets have a face frame across the box front — the traditional American build, slightly less interior width, more forgiving in an older house where nothing is plumb. Frameless (often called full-access) gives you the whole box opening and a tighter, more contemporary reveal, but it is less tolerant of out-of-square walls. In a 1930s house in Elizabeth I lean framed; in a new build in Weddington either works.

Door style and finish

Shaker is the default for a reason, and there is nothing wrong with the default. What changes the character more than the door profile is the rail width and the finish: a five-inch rail reads heavier and more traditional than a two-and-a-quarter. Painted finishes show wear on the inside edges of doors near a trash pull-out, so that's the one cabinet I sometimes specify differently.

The interior plan

This is the part that decides whether the kitchen is pleasant to use, and it's the part most often left to the shop's defaults.

  • Drawers instead of lower doors, nearly always.
  • Deep drawers for pots, with the drawer boxes sized to what you actually own.
  • A pull-out beside the range for oils.
  • Vertical dividers for trays and boards.
  • The trash pull-out within a step of the sink and the prep zone, not at the far end of the run.

Storage isn't about square footage; it's about the number of steps between where a thing lives and where you use it. A pantry across the room is worse than a shallow cabinet beside the range.

Countertops: an honest comparison

The answer depends on how the room is used, not on what's fashionable this year. What follows is how these materials actually behave.

MaterialHeatAcid & stainsHonest summary
Quartz (engineered)Poor — resin scorches; always use a trivetExcellent, non-porous, no sealingThe low-anxiety choice for a kitchen that cooks nightly. Consistent, so what you see in the slab is what you get across the run.
GraniteVery goodGood; needs periodic sealingUnderrated right now. Modern quarries produce far quieter patterns than the speckled slabs that gave it a reputation.
MarbleVery goodEtches on lemon, wine, vinegar — permanentlyBeautiful and high-maintenance. Fine in a guest bath or on a baking island if you accept that it will develop a patina. Not for a family kitchen unless you genuinely like the aged look.
Quartzite (natural)Very goodGood, but varies by stoneMarble's look with better manners. Verify it's true quartzite — a lot of soft dolomite is sold as quartzite and behaves like marble.
Butcher blockPoorStains; needs oilingWarm on an island or a small run. Not around a sink unless you're committed to maintenance.

Two practical notes. Go and see the actual slab, not a sample — veining varies enormously across a single stone, and where the seam falls on an island is a decision worth making in the yard rather than leaving to the fabricator. And decide the edge profile deliberately: a simple eased edge suits nearly everything, while a heavy ogee immediately dates a room.

Tile, layout and the grout nobody plans

Tile decisions are three decisions: the tile, the layout, and the grout. The third is treated as an afterthought and changes the result more than people expect. Grout that matches the tile makes a field read as one surface; contrasting grout makes it read as a pattern of lines. Neither is wrong — but on a herringbone backsplash, contrasting grout turns a quiet wall into the loudest thing in the kitchen.

For layout, the questions are where the field starts, how it ends at an outside corner, what happens where it meets the underside of a cabinet, and whether the run behind the range gets a different treatment. Deciding those in advance is what avoids the sliver cut.

In a shower, slope, waterproofing and niche placement are settled before tile is ordered. A niche should sit off the wall you face when the water hits you, at a height that suits whoever uses it — and it should be sized to a whole number of tiles.

Appliances decide the drawing

Cabinetry is drawn to appliance dimensions, so appliances get settled before the cabinet order — not after. A panel-ready refrigerator, a 36-inch range instead of a 30, a counter-depth versus a standard-depth fridge: each changes the drawing, not just the invoice.

Ventilation is the piece most often undersized. A powerful range wants a hood that actually moves air and is ducted outside, and the duct route has to exist. Recirculating hoods filter grease and do nothing for heat or moisture. If you cook with high heat, this matters more than the hood's appearance.

Lighting and electrical while the walls are open

This is the cheapest moment in the entire project to get lighting right and the most expensive one to skip. Under-cabinet lighting on its own switch. Recessed cans placed over the front edge of the counter rather than centered in the walkway, so you aren't working in your own shadow. Pendants over an island sized and spaced to the island, not to a rule of thumb — there's a full write-up on that here. Outlets planned around where you'll actually stand.

In a bathroom, the single biggest improvement is light at face height beside the mirror rather than only above it. Overhead-only lighting casts every shadow downward, which is why you look tired in your own bathroom and fine everywhere else. The bathroom lighting guide covers placement and heights, and the electrical walkthrough checklist is worth reading before your builder's rough-in walk.

Hardware, metals and mixing them

You can mix metals — the rule is to be deliberate rather than accidental. Pick a dominant metal and one accent, and let the dominant one carry the room. Unlacquered brass will patina and is meant to; if you want it to stay bright, buy lacquered and accept that it will eventually wear at the touch points.

Pull length is worth specifying rather than leaving to the shop: pulls that are too small on a wide drawer make the cabinetry look cheap, and it's a twelve-dollar difference per piece.

Sequence and lead times

  • Cabinetry is usually the long pole — commonly six to twelve weeks after the final drawing is approved, and that clock does not start until every appliance is confirmed.
  • Stone is templated only after the cabinets are installed, then fabricated, which typically adds one to three weeks between "cabinets in" and "counters in."
  • Tile should be on site before the setter starts, with overage ordered from the same lot.
  • Plumbing fixtures need to be on hand at rough-in, because the valve body has to be in the wall.

The practical consequence: there is a period in the middle of every kitchen renovation with no counters. That's normal, it's predictable, and knowing it's coming makes it much easier to live through.

The bathroom decisions that are specific to bathrooms

Bathrooms are small, which makes people assume they're simpler. They're not — there are more fixed components per square foot than in any other room, and almost all of them are plumbed.

  • Vanity height. The old standard is 30–32 inches; comfort height is 34–36. Comfort height suits most adults and is worth choosing deliberately rather than accepting whatever the vanity comes at. In a children's bathroom, standard height genuinely is better.
  • Mirror and sconce geometry. Sconces at roughly 60–66 inches to center, flanking the mirror, spaced 36–40 inches apart. That's the difference between flattering light and overhead shadow. If the wall can't take flanking sconces, a fixture above the mirror is second best and should be wide, not narrow.
  • Shower niche. Placed on a wall you don't face into the spray, sized to whole tiles, sloped very slightly to drain, and positioned at a height that suits whoever uses it — usually 48–52 inches to the base.
  • Glass. Frameless reads cleanest and costs most; semi-frameless is a reasonable middle. Whichever, the glass is templated after tile, so it's one of the last things to arrive and shouldn't be forgotten in the schedule.
  • Ventilation. Sized to the room and ducted outside, not into an attic. An undersized fan in a Charlotte summer is how a beautifully renovated bathroom develops a mildew problem in its second year.
  • Floor warmth. Electric underfloor heat is comparatively inexpensive at the point of tiling and impossible to add later. In a primary bath it's the upgrade people mention most afterwards.

Storage, planned rather than assumed

The storage question in both rooms is the same: how many steps between where a thing lives and where you use it.

In a kitchen that means zones.

  • Everything for coffee within reach of the coffee maker.
  • Pots and pans beside the range, not across the room.
  • Baking equipment near the largest run of counter.
  • Everyday dishes between the dishwasher and the table, because the return journey happens every day and the outbound one doesn't.

In a bathroom it means drawers rather than a cabinet with one shelf, an outlet inside a drawer for what charges, and somewhere to put things down beside the sink that isn't the sink.

Renovating in stages

If the whole thing can't happen at once, that's one of the better reasons to plan all of it now. Settling the complete scheme means the counters you buy in two years still agree with the cabinets you order this month, and the second phase doesn't have to apologize for the first. It also lets us decide which items are worth buying early and storing.

What I need before we start

  • Measurements of the room with window and door positions.
  • Photographs including the ceiling.
  • A note of what's fixed — a wall that can't move, an appliance already bought, a builder's deadline.
  • An honest budget range.

If some of it is already ordered, tell me exactly what is ordered versus what is only quoted; everything still open gets chosen to agree with what's already committed.

If the project extends past these rooms, full interior design takes the same approach across the house. If the question is really about color rather than construction, that's the paint consultation. And if you'd like to talk it through before committing to anything, an hour on a virtual consultation is often the fastest way to find out what the project actually is.

You can see finished rooms in the portfolioReimagined from Room to Room is a dark-cabinetry kitchen in a light room, and Reimagined from Room to Room deals with scale in a tall space. Renovating and keeping the cabinets is worth reading if you're weighing a full gut against a lighter refresh, and the bathroom measurement guide lists every dimension I'd want before drawing one.